MCQOPTIONS
Saved Bookmarks
1. |
Which readings should be taken while drying out process of transformer? |
A. | Insulation reading between HV and LV |
B. | Temperature |
C. | Time |
D. | Insulation, temperature, time all readings |
Answer» E. | |