MCQOPTIONS
Saved Bookmarks
| 1. |
Which one of the following methods is generally adopted for tunnelling in firm ground |
| A. | Full face method |
| B. | Top heading and benching method |
| C. | Drift method |
| D. | All the above. |
| Answer» E. | |