MCQOPTIONS
Saved Bookmarks
| 1. |
Concrete lining is provided concurrently with the driving operation in case of |
| A. | rock terrain |
| B. | soft rock |
| C. | running soil |
| D. | none of these. |
| Answer» B. soft rock | |