| 1. | An offset is laid out 2° from its true direction on the field. If the scale of plotting is 10 m to 1 cm, find the maximum length of the offset so that the displacement of the point on the paper may not exceed 0.25 mm? | 
| A. | 7.10 m | 
| B. | 7.16 m | 
| C. | 7.11 m | 
| D. | 7.14 m | 
| Answer» C. 7.11 m | |
| 2. | The work in running a survey line is ____________ fold. | 
| A. | one | 
| B. | two | 
| C. | three | 
| D. | four | 
| Answer» C. three | |
| 3. | Whenever possible, a survey station must be fixed with reference to a minimum ____ number of permanent objects. | 
| A. | 1 | 
| B. | 2 | 
| C. | 3 | 
| D. | 4 | 
| Answer» C. 3 | |
| 4. | Which of the following details need not be given at the beginning of a particular chain survey lines? | 
| A. | Name of the line | 
| B. | Name of the station marked | 
| C. | Bearing of the line | 
| D. | Length of line | 
| Answer» E. | |
| 5. | The chain line may be represented either by a single line or by two lines spaced about ____ to _____ cm apart. | 
| A. | 1.5 to 2 | 
| B. | 2 to 3 | 
| C. | 1.5 to 2.5 | 
| D. | 2.5 to 3.5 | 
| Answer» B. 2 to 3 | |
| 6. | AN_OFFSET_IS_LAID_OUT_2¬¨ àû_FROM_ITS_TRUE_DIRECTION_ON_THE_FIELD._IF_THE_SCALE_OF_PLOTTING_IS_10_M_TO_1_CM,_FIND_THE_MAXIMUM_LENGTH_OF_THE_OFFSET_SO_THAT_THE_DISPLACEMENT_OF_THE_POINT_ON_THE_PAPER_MAY_NOT_EXCEED_0.25_MM??$# | 
| A. | 7.10 m | 
| B. | 7.16 m | 
| C. | 7.11 m | 
| D. | 7.14 m | 
| Answer» C. 7.11 m | |
| 7. | THE_WORK_IN_RUNNING_A_SURVEY_LINE_IS______________FOLD.?$ | 
| A. | one | 
| B. | two | 
| C. | three | 
| D. | four | 
| Answer» C. three | |
| 8. | Whenever possible, a survey station must be fixed with reference to a minimum ____ number of permanent objects? | 
| A. | 1 | 
| B. | 2 | 
| C. | 3 | 
| D. | 4 | 
| Answer» C. 3 | |
| 9. | At what step of chain surveying surveyor should investigate various difficulties that may arise and think of their solution? | 
| A. | Before selecting survey stations | 
| B. | after selecting survey stations | 
| C. | During reconnaissance | 
| D. | After marking survey stations | 
| Answer» B. after selecting survey stations | |
| 10. | Which of the following details need not be given at the beginning of a particular chain survey? | 
| A. | Date of survey | 
| B. | Names of surveyors | 
| C. | Details of survey lines | 
| D. | Type of soil | 
| Answer» E. | |
| 11. | The chain line may be represented either by a single line or by two lines spaced about ____ to _____ cm apart. | 
| A. | 1.5 to 2 | 
| B. | 2 to 3 | 
| C. | 1.5 to 2.5 | 
| D. | 2.5 to 3.5 | 
| Answer» B. 2 to 3 | |
| 12. | What is the size of a field book? | 
| A. | 20 cm x 20 cm | 
| B. | 25 cm x 20 cm | 
| C. | 20 cm x 25 cm | 
| D. | 25 cm x 25 cm | 
| Answer» B. 25 cm x 20 cm | |
| 13. | The book in which the chain or tape measurements are entered is called the _______ | 
| A. | Assistant book | 
| B. | Surveyor book | 
| C. | Field book | 
| D. | Survey book | 
| Answer» D. Survey book | |
| 14. | What is the prominent point on the chain line and can be either at the beginning of the chain line or at the end? | 
| A. | Subsidiary station | 
| B. | Surveyor station | 
| C. | Main station | 
| D. | Tie stations | 
| Answer» D. Tie stations | |