MCQOPTIONS
Saved Bookmarks
| 1. |
Which one of the following methods is adopted for permanent drainage of tunnels : |
| A. | provision of longitudinal drains |
| B. | continuous open drains |
| C. | concrete lining |
| D. | All the above. |
| Answer» E. | |