

MCQOPTIONS
Saved Bookmarks
1. |
Which one of the following is the best method for locating sounding to estimate the dredged material from the harbours ? |
A. | Two angles from shore |
B. | Two angles from boat |
C. | One angle from shore and other from the boat |
D. | Fixed intersecting ranges |
Answer» D. Fixed intersecting ranges | |