Which of the following is not a method for dam construction when a shear zone is encountered? |
A. | Construct on shear zone |
B. | Grouting the shear zones |
C. | Try and avoid the site as much as possible |
D. | Excavation and back filling |
Answer» B. Grouting the shear zones | |