

MCQOPTIONS
Saved Bookmarks
1. |
What is the Closed Loop power control frequency to adjust power levels in the AT or AN in the Reverse Link of an EVDO network? |
A. | 512 ms |
B. | 1.25 ms |
C. | 5 ms |
D. | None |
Answer» C. 5 ms | |