MCQOPTIONS
Saved Bookmarks
| 1. |
What is Critical Path? |
| A. | the length of the longest path in a task dependency graph is called the critical path length. |
| B. | the length of the smallest path in a task dependency graph is called the critical path length. |
| C. | path with loop |
| D. | none of the mentioned. |
| Answer» B. the length of the smallest path in a task dependency graph is called the critical path length. | |