

MCQOPTIONS
Saved Bookmarks
1. |
Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is , and that of the precast driven pile is , then which of the following is correct ? |
A. | > |
B. | = |
C. | < |
D. | No specific comparison may hold good |
Answer» B. = | |