MCQOPTIONS
Saved Bookmarks
| 1. |
Total indirect cost in pool by an actual quantity of cost allocation base is used to calculate |
| A. | ctual manufacturing overhead rate |
| B. | anufacturing overhead costs |
| C. | verhead rate |
| D. | irect rate |
| Answer» B. anufacturing overhead costs | |