1.

To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between

A. 3 to 5 cm
B. 4 to 6 cm
C. 5 to 7 cm
D. 7 to 10 cm
Answer» E.


Discussion

No Comment Found