

MCQOPTIONS
Saved Bookmarks
1. |
The type of testing to be performed for the evaluation is not determined by ______ |
A. | Urgency of design |
B. | Type of highway |
C. | Importance of highway |
D. | Availability of tools |
Answer» C. Importance of highway | |