MCQOPTIONS
Saved Bookmarks
| 1. |
The type of testing to be performed for the evaluation is not determined by ______ |
| A. | Urgency of design |
| B. | Type of highway |
| C. | Importance of highway |
| D. | Availability of tools |
| Answer» C. Importance of highway | |