The traffic volume is usually projected for ______..
1.
The traffic volume is usually projected for ______ years.
A.
15
B.
20
C.
25
D.
30
Answer» C. 25
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The IRC method of rigid pavement design consists of the determination of various parameters. Which of the below options represents the order of designing the parameters?
Which of the below represents a safe design?
The trial thickness is considered to be unsafe if the cumulative fatigue life is ______
To calculate the corner stress, the equation by ______ is used.
What is stress ratio?
The states belonging to which zone have the maximum temperature differential?
What is the range of values for flexural strength of concrete?
The equation (f_{cr}=0.49f_{ck}^{0 55} ) to find the flexural strength of concrete was given by ______
Which of the below is used as a check for the design of slab thickness?
The design of rigid pavement essentially means the computation of slab thickness.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply