

MCQOPTIONS
Saved Bookmarks
1. |
The total blow required for the second and third 15 cm of penetration in standard penetration test is taken as |
A. | seating drive |
B. | penetration resistance |
C. | overburden pressure |
D. | dilatancy/submergence |
Answer» B. penetration resistance | |