MCQOPTIONS
Saved Bookmarks
| 1. |
The time activity consumes in most adverse conditions is |
| A. | Optimistic time |
| B. | Pessimistic time |
| C. | Most likely time |
| D. | All of the above |
| Answer» C. Most likely time | |