

MCQOPTIONS
Saved Bookmarks
1. |
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is |
A. | 4.76 m3 |
B. | 10.32 m3 |
C. | 8.43 m3 |
D. | 6.51 m3 |
Answer» E. | |