

MCQOPTIONS
Saved Bookmarks
1. |
The proposed dam shown in the below figure is 90 m long and coefficient of permeability of the soil is 0.0013 mm/second. The quantity of water (m) that will be lost per day, by seepage is (rounded to the nearest number): |
A. | 55 |
B. | 57 |
C. | 59 |
D. | 61 |
Answer» E. | |