MCQOPTIONS
Saved Bookmarks
| 1. |
The incurred costs to exclude the production of goods, that do not meet the specification, are called |
| A. | rework costs |
| B. | prevention costs |
| C. | incremental costs |
| D. | reengineering costs |
| Answer» C. incremental costs | |