MCQOPTIONS
Bookmark
Saved Bookmarks
→
Irrigation Engineering
→
Canal Irrigation System and Canal Falls in Irrigation Engineering
→
The general value of lift for concrete is taken a..
1.
The general value of lift for concrete is taken as __________________
A.
1.5 m
B.
2.5 m
C.
3 m
D.
4 m
Answer» B. 2.5 m
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The foundation pressure used in the pressure grouting is equal to _________________
Which of the following joints justifies the two-dimensional analysis of gravity dams?
The horizontal joints that extends through the entire width of the dam section and are developed at each lift height is called as ___________________
The general value of lift for concrete is taken as __________________
In order to reduce uplift on a gravity dam, the type of grouting done is ____________________
Leakage through the transverse joints in a gravity dam is prevented by ____________
Transverse joints in concrete gravity dams are the ___________________________
Which of the following attempts are made to reduce the uplift in order to economize on the provided section of a concrete gravity dam?i. Providing drainage gallery to collect seepage waterii. Constructing cut-off under upstream faceiii. Pressure grouting in dam foundationiv. Provision of shear keys or keyways
The provision of drainage gallery in a gravity dam helps in reducing ____________________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply