1. |
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________? |
A. | 1.5 m 3 |
B. | 2.5 m3 |
C. | 3.5 m3 |
D. | 5.0 m3 |
Answer» E. | |