MCQOPTIONS
Saved Bookmarks
| 1. |
The difference between absorption and variable costing is the accountability of |
| A. | direct overhead |
| B. | indirect overhead cost |
| C. | fixed manufacturing cost |
| D. | variable manufacturing cost |
| Answer» D. variable manufacturing cost | |