MCQOPTIONS
Saved Bookmarks
| 1. |
The critical path of a network represents |
| A. | the minimum time required for completion of project |
| B. | the maximum time required for completion of project |
| C. | maximum cost required for completion of project |
| D. | none of the above |
| Answer» B. the maximum time required for completion of project | |