				This section includes 77 Mcqs, each offering curated multiple-choice questions to sharpen your GATE (Mechanical Engineering) knowledge and support exam preparation. Choose a topic below to get started.
| 1. | After using a carbon dioxide fire extinguisher, the nozzle gets extremely cold.What does this indicate? | 
| A. | You should not use it. | 
| B. | The material inside is finished. | 
| C. | It is safe to continue. | 
| D. | The materials inside are running low | 
| Answer» B. The material inside is finished. | |
| 2. | Queing theory is associated with | 
| A. | sales | 
| B. | inspection time | 
| C. | waiting time | 
| D. | production time | 
| Answer» D. production time | |
| 3. | In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if | 
| A. | complete detailsof items in, waiting line are known | 
| B. | arrival and waiting times are known and can be grouped to form a waiting line model | 
| C. | all variables and constants are known and form a linear equation | 
| D. | the laws governing arrivals, service times, and the order in which the arriving units are taken into source are known | 
| Answer» E. | |
| 4. | PERT is the | 
| A. | time oriented technique | 
| B. | event oriented technique | 
| C. | activity oriented technique | 
| D. | target oriented technique | 
| Answer» C. activity oriented technique | |
| 5. | Which of the following equations is not in conformity with others | 
| A. | organisation performance x motivation = profits | 
| B. | knowledge x skill = ability | 
| C. | ability x motivation = performance | 
| D. | attitude x situation = motivation | 
| Answer» B. knowledge x skill = ability | |
| 6. | Work study comprises following main techniques | 
| A. | method study and work measurement | 
| B. | method study and time study | 
| C. | time study and work measurement | 
| D. | method study and job evaluation | 
| Answer» B. method study and time study | |
| 7. | A big advantage of PERT over Gantt charts is that in the former case | 
| A. | activities and events are clearly shown | 
| B. | early start and late finish of an acivity are clearly marked | 
| C. | activity times are clear | 
| D. | inter-relationship among activities is clearly shown. | 
| Answer» E. | |
| 8. | PERT and CPM are | 
| A. | techniques to determine project status | 
| B. | decision making techniques | 
| C. | charts which increase aesthetic ap-pearance of rooms | 
| D. | aids to the decision maker. | 
| Answer» E. | |
| 9. | Slack represents the difference between the | 
| A. | latest allowable time and the normal expected time | 
| B. | latest allowable time and the earliest expected time | 
| C. | proposed allowable time and the ear-liest expected time | 
| D. | normal allowable time and the latest expected time | 
| Answer» C. proposed allowable time and the ear-liest expected time | |
| 10. | String diagram is used | 
| A. | for checking the relative values of various layouts | 
| B. | when a group of workers are working at a place | 
| C. | where processes require the operator to be moved from one place to another | 
| D. | all of the above | 
| Answer» E. | |
| 11. | Replacement studies are made on the fol-lowing basis: | 
| A. | annual cost method | 
| B. | rate of return method | 
| C. | total life average method | 
| D. | any one of the above. | 
| Answer» E. | |
| 12. | The linear programming techniques can be applied successfully to industries like | 
| A. | iron and steel | 
| B. | food processing | 
| C. | oil and chemical | 
| D. | all of the above. | 
| Answer» E. | |
| 13. | In order that linear programming techniques provide valid results | 
| A. | relations between factors must be linear (positive) | 
| B. | relations between factors must be linear (negative) | 
| C. | (a) or (b) | 
| D. | only one factor should change at a time, others remaining constant | 
| Answer» D. only one factor should change at a time, others remaining constant | |
| 14. | If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be | 
| A. | 2 HA | 
| B. | 1.33 HA | 
| C. | 1.5 HA | 
| D. | 1.15 HA | 
| Answer» B. 1.33 HA | |
| 15. | According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be | 
| A. | HA | 
| B. | HA + (S~A) HA | 
| C. | HA + ^^-H | 
| D. | HA + ^^-H | 
| Answer» C. HA + ^^-H | |
| 16. | The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as | 
| A. | Rowan Plan | 
| B. | Bedaux Plan | 
| C. | Taylor Differential Piece rate system | 
| D. | Halsey Premium plan | 
| Answer» E. | |
| 17. | Which of the following plans motivates supervisors by paying a premium on time saved by workers | 
| A. | Halsey plan | 
| B. | Rowan plan | 
| C. | Haynes plan | 
| D. | Emersons plan | 
| Answer» D. Emersons plan | |
| 18. | Which of the following is not wage incentive plan | 
| A. | differential piece rate System | 
| B. | Rowan plan | 
| C. | Emerson plan | 
| D. | Taylor plan | 
| Answer» E. | |
| 19. | In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic pay/wages, is based on : | 
| A. | a standard rating system | 
| B. | a merit rating system | 
| C. | a job evaluation system | 
| D. | all of the above | 
| Answer» C. a job evaluation system | |
| 20. | PERT has following time estimate | 
| A. | one time estimate | 
| B. | two time estimate | 
| C. | three time estimate | 
| D. | four time estimate | 
| Answer» D. four time estimate | |
| 21. | CPM has following time estimate | 
| A. | one time estimate | 
| B. | two time estimate | 
| C. | three time estimate | 
| D. | four time estimate | 
| Answer» B. two time estimate | |
| 22. | In the Halsey system of wage incentive plan, a worker is | 
| A. | paid as per efficiency | 
| B. | ensured of minimum wages | 
| C. | not paid any bonus till his efficiency 2 reaches 66 % | 
| D. | never a loser | 
| Answer» C. not paid any bonus till his efficiency 2 reaches 66 % | |
| 23. | In the Halsey 50-50 plan, the following are rewarded more | 
| A. | past good workers | 
| B. | past poor workers | 
| C. | past average workers | 
| D. | all of the above | 
| Answer» C. past average workers | |
| 24. | Which one of the following represents a group incentive plan ? | 
| A. | Scanlon Plan | 
| B. | Rowan Plan | 
| C. | Bedaux Plan | 
| D. | Taylor Differential Piece Rate System | 
| Answer» B. Rowan Plan | |
| 25. | An optimum project schedule implies | 
| A. | optimum utilisation of men, machines and materials | 
| B. | lowest possible cost and shortest possible time for project | 
| C. | timely execution of project | 
| D. | to produce best results under given constraints | 
| Answer» C. timely execution of project | |
| 26. | Routing is essential in the following type of industry | 
| A. | assembly industry | 
| B. | process industry | 
| C. | job order industry | 
| D. | mass production industry | 
| Answer» B. process industry | |
| 27. | In Halsey 50-50 plan, output standards are established | 
| A. | by time study | 
| B. | from previous production records | 
| C. | from ones judgement | 
| D. | all of the above | 
| Answer» C. from ones judgement | |
| 28. | The objective of time study is to determine the time required to complete a job by | 
| A. | fast worker | 
| B. | average worker | 
| C. | slow worker | 
| D. | new entrant | 
| Answer» C. slow worker | |
| 29. | Current assets include | 
| A. | manufacturing plant | 
| B. | manufacturing plant and equipment | 
| C. | inventories | 
| D. | common stock held by the firm | 
| Answer» B. manufacturing plant and equipment | |
| 30. | Tick the odd man out | 
| A. | Taylor | 
| B. | Drucker | 
| C. | McGregor | 
| D. | Galileo | 
| Answer» E. | |
| 31. | The amount deducted from the salary of workers towards employees provident fund is | 
| A. | credited into reserves of company | 
| B. | deposited in nationalised bank | 
| C. | deposited in post office | 
| D. | deposited in the account of worker with Provident Fund Commissioner. | 
| Answer» E. | |
| 32. | The employees provident fund act is applicable to | 
| A. | all industries | 
| B. | all industries other than small and medium industries | 
| C. | volunteers | 
| D. | the industries notified by Government | 
| Answer» E. | |
| 33. | Which of the following layouts is suited to job production | 
| A. | process layout | 
| B. | product layout | 
| C. | fixed position layout | 
| D. | plant layout | 
| Answer» B. product layout | |
| 34. | Pick up the incorrect statement about advantages of work sampling | 
| A. | permits a fine breakdown of activities and delays | 
| B. | simultaneous study of many operators may be made by a single observer | 
| C. | calculations are easier, method is economical and less time consuming | 
| D. | no time measuring devices are generally needed | 
| Answer» B. simultaneous study of many operators may be made by a single observer | |
| 35. | Standard time as compared to normal time is | 
| A. | greater | 
| B. | smaller | 
| C. | equal | 
| D. | there is no such correlation | 
| Answer» B. smaller | |
| 36. | Motion study involves analysis of | 
| A. | actions of operator | 
| B. | layout of work place | 
| C. | tooling and equipment | 
| D. | all of the above | 
| Answer» B. layout of work place | |
| 37. | Material handling and plant location is analysed by | 
| A. | Gnatt chart | 
| B. | bin chart | 
| C. | Travel Chart | 
| D. | activity chart | 
| Answer» D. activity chart | |
| 38. | Merit Rating is the method of determining worth of | 
| A. | a job | 
| B. | an individual employee | 
| C. | a particular division in workshop | 
| D. | machine | 
| Answer» C. a particular division in workshop | |
| 39. | According to MAPI formula, the old machine should be replaced by new one when | 
| A. | CAM < DAM | 
| B. | CAM > DAM | 
| C. | CAM = DAM | 
| D. | there is no such criterion | 
| Answer» B. CAM > DAM | |
| 40. | The term 'value' in value engineering refers to | 
| A. | total cost of the product | 
| B. | selling price of the product | 
| C. | utility of the product | 
| D. | manufactured cost of the product | 
| Answer» D. manufactured cost of the product | |
| 41. | The technique of value analysis can be applied to | 
| A. | complicated items only | 
| B. | simple items only | 
| C. | crash-programme items only | 
| D. | any item. | 
| Answer» E. | |
| 42. | Acceptance sampling is widely used in | 
| A. | batch production | 
| B. | job production | 
| C. | mass production | 
| D. | all of the above | 
| Answer» D. all of the above | |
| 43. | The appellate authority for an industrial dispute is | 
| A. | management | 
| B. | labour court | 
| C. | high court/supreme court | 
| D. | board of directors | 
| Answer» D. board of directors | |
| 44. | Statistical quality control techniques are based on the theory of | 
| A. | quality | 
| B. | statistics | 
| C. | probability | 
| D. | all of the above | 
| Answer» D. all of the above | |
| 45. | In inventory control, the economic order quantity is the | 
| A. | optimum lot size | 
| B. | highest level of inventory | 
| C. | lot corresponding to break-even point | 
| D. | capability of a plant to produce | 
| Answer» B. highest level of inventory | |
| 46. | Inventory management consists of | 
| A. | effective running of stores | 
| B. | state of merchandise methods of strong and maintenance etc. | 
| C. | stock control system | 
| D. | all of the above | 
| Answer» E. | |
| 47. | Gnatt charts are used for | 
| A. | forecasting sales | 
| B. | production schedule | 
| C. | scheduling and routing | 
| D. | linear programming | 
| Answer» C. scheduling and routing | |
| 48. | Which of the following is independent of sales forecast | 
| A. | productivity | 
| B. | inventory control | 
| C. | production planning | 
| D. | production control | 
| Answer» B. inventory control | |
| 49. | Which of the following organisation is preferred in automobile industry | 
| A. | functional organisation | 
| B. | line organisation | 
| C. | staff organisation | 
| D. | line and staff organisations | 
| Answer» E. | |
| 50. | The grouping of activities into organisational units is called | 
| A. | corporate plans | 
| B. | higher level management | 
| C. | functional authority | 
| D. | departmentatidn | 
| Answer» E. | |