1. |
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________? |
A. | Rs. 400 |
B. | Rs. 425 |
C. | Rs. 450 |
D. | Rs. 500 |
Answer» D. Rs. 500 | |