MCQOPTIONS
Saved Bookmarks
| 1. |
The capillary cut off to arrest frost action can be done by ______ |
| A. | Geofibre |
| B. | Laying pipes |
| C. | Bituminous layer |
| D. | Lowering the water table |
| Answer» D. Lowering the water table | |