1.

The budgeted variable overhead rate, is multiplied to an actual quantity of allocation base, is to calculate variable manufacturing cost of overheads in

A. direct costing method
B. indirect costing method
C. actual costing method
D. normal costing method
Answer» E.


Discussion

No Comment Found