MCQOPTIONS
Bookmark
Saved Bookmarks
→
Waste Water Engineering
→
Removal Iron Manganese Arsenic in Waste Water Engineering
→
Screening and comminution are preliminary treatmen..
1.
Screening and comminution are preliminary treatment processes.
A.
True
B.
False
Answer» B. False
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
NITRIFICATION_EFFICIENCY_IS_SIGNIFICANTLY_SUPPRESSED_AS_THE_TEMPERATURE_IS__________?$
In rotating biological contractors, what percent of corrugated plastic discs are submerged?$
__________ is a process which involves further removal of the nitrogen.$
What is the intermediate zone composed of in aerobic-anaerobic ponds?
What is the most common used coagulant?
Which process is employed to gain sufficient head for the wastewater?
Which of the following should be provided in the case where aeration is absent?
Supplemental means of aeration are often employed with an equalization basin to provide better mixing.
__________ represents the heavier inert matter in wastewater.
_____ devices remove materials which would damage equipment or interfere with a process.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply