

MCQOPTIONS
Saved Bookmarks
1. |
Plant use factor is |
A. | Maximum demand/Connected load |
B. | Number of units generated/(Plant capacity × number of hours plant operated) |
C. | Average demand/plant capacity |
D. | Average load/Maximum load |
Answer» C. Average demand/plant capacity | |