MCQOPTIONS
Bookmark
Saved Bookmarks
→
Pavement Design
→
Bituminous Material Tests 1 in Pavement Design
→
______ pavement has a concrete slab as the topmos..
1.
______ pavement has a concrete slab as the topmost layer.
A.
Fixed
B.
Flexible
C.
Portable
D.
Rigid
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Kerb is provided at the edge of interlocking cement concrete block pavement to ______
Perpetual pavements can last longer than 50 years without any maintenance.
Rigid pavements are stiffer than flexible pavements due to ______
What is the name of the pavement shown in the figure below?
Which of the below IRC codes gives the guidelines for use of interlocking concrete block pavement?
In which of the below types of pavement can joints be eliminated completely?
Which of the below is not a primary function of a pavement?
Interlocking cement concrete block pavement can be used in areas of heavy traffic.
______ pavement consists of both flexible and rigid layers.
After how long can the flexible pavement be opened to the public after its construction?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply