MCQOPTIONS
Bookmark
Saved Bookmarks
→
Building Construction
→
Types Stairs in Building Construction
→
___________ of bhusa per m
3
of clay is ..
1.
___________ of bhusa per m
3
of clay is used to prepare mud-phuska.
A.
4 kg
B.
8 kg
C.
12 kg
D.
15 kg
Answer» C. 12 kg
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
In Jodhpur type roofing, ralthal laid should be cured for ___________ days.
The joints between the stone slabs in Jodhpur type roofing should be ___________ shaped.
The speed of flat roof construction is faster than the pitched roof.
The average thickness of the lime concrete laid in lime concrete and tiles roofing is ________
Which of the following types of roofing is used for timber roofs of verandah?
___________ of bhusa per m<sup>3</sup> of clay is used to prepare mud-phuska.
In mud-phuska terracing with tile paving, bitumen is spread over the R.C.C. slabs at the rate of ________ of bitumen per m<sup>2</sup> of the roof surface.
Brick-jelly roofing is also known as _________
In Punjab, mud terracing is done on ________
Mud-terrace roofing is made of white earth mud which contains a large percentage of _________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply