

MCQOPTIONS
Saved Bookmarks
1. |
In mud-phuska terracing with tile paving, bitumen is spread over the R.C.C. slabs at the rate of ________ of bitumen per m2 of the roof surface. |
A. | 0.7 kg |
B. | 1.7 kg |
C. | 2.7 kg |
D. | 3.7 kg |
Answer» C. 2.7 kg | |