MIL STD 105E was first issued in ________..
1.
MIL STD 105E was first issued in ________
A.
1949
B.
1937
C.
1945
D.
1950
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
When should the inspection with the provision of MIL STD 105E be terminated?
When is the normal inspection to be instituted instead of tightened inspection?
Tightened inspection is instituted when at least ______ out of 5 consecutive lots have been rejected on original submission.
Level I of inspection of MIL STD 105E requires about __________ amount inspection as Level II.
AQL is the __________
MIL STD 105E is a _________
TIGHTENED_INSPECTION_IS_INSTITUTED_WHEN_AT_LEAST_____OUT_OF_5_CONSECUTIVE_LOTS_HAVE_BEEN_REJECTED_ON_ORIGINAL_SUBMISSION.?$
When should the inspection with the provision of MIL STD 105E be terminated?$
When_is_the_normal_inspection_to_be_instituted_instead_of_tightened_inspection?$
Level I of inspection of MIL STD 105E requires about ____ amount inspection as Level II?