| 1. |
Match the following List 1 to List 2:a. Project Risk ------------- i. Threaten the quality and timeliness of the software to be produced.b. Technical Risk ---------- ii. Threaten the viability of the software to be built.c. Business Risk ----------- iii. Threaten the project plan. |
| A. | a - iii, b - ii, c - i |
| B. | a - ii, b - iii, c - i |
| C. | a - iii, b - i, c - ii |
| D. | a - i, b - ii, c - iii |
| Answer» D. a - i, b - ii, c - iii | |