

MCQOPTIONS
Saved Bookmarks
1. |
It is required to cut screw threads of 2 mm pitch on a lathe. The lead screw has a pitch of 6 mm. If the spindle speed is 60 r.p.m., then the speed of lead screw will be |
A. | 10 r.p.m. |
B. | 20 r.p.m. |
C. | 120 r.p.m. |
D. | 180 r.p.m. |
Answer» C. 120 r.p.m. | |