

MCQOPTIONS
Saved Bookmarks
1. |
is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality. |
A. | cube rate estimate |
B. | supplementary estimate |
C. | maintenance estimate |
D. | plinth area estimate |
Answer» E. | |