MCQOPTIONS
Saved Bookmarks
| 1. |
______ is done after identifying the repair limits in the FDR method. |
| A. | Removal of slab |
| B. | Drill holes |
| C. | Saw-cut the perimeter |
| D. | Removal of the damaged base |
| Answer» D. Removal of the damaged base | |