1.

In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at________________?_x005F_x000D_Consider the following situations_x005F_x000D_1. Soil is soft_x005F_x000D_2. Volume of existing surface traffic on the alignment is heavy_x005F_x000D_3. Track is at a deeper level_x005F_x000D_4. Water table is high

A. 1 and 2
B. 1 and 3
C. 1 and 4
D. 2 and 3
Answer» D. 2 and 3