In roadway slabs, construction joints should be f..
1.
In roadway slabs, construction joints should be formed?
A.
Vertical
B.
Horizontal
C.
Aligned
D.
Loaded
Answer» B. Horizontal
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
In roadway slabs, construction joints should be formed?
When the work has resumed the surfaces of the concrete previously placed should be cleaned of ____________
The construction joints should be located at points of ____________
A nano polymer range which meets wider expectations as aesthetics is known as ____________
The British and Indian standard codes on prestressed concrete maximum limiting crack for members exposed to aggressive environment is?
The width of cracks is influenced by?
The stabilized mean crack spacing acs can be expressed as ____________
The reason for smaller crack widths in slabs under service loads is?
The formula recommended by the British code BS: 8110 – 1985 for the estimation of surface crack width Wcr is?
The width of cracks that developed in prestressed members is governed by how many factors?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply