

MCQOPTIONS
Saved Bookmarks
1. |
In case of laying gullies, siphons, intercepting traps, the cost includes |
A. | All the above. |
B. | Setting and laying |
C. | Bed concreting |
D. | Connection to drains |
Answer» E. | |