1.

In a project, the contractor is paid on the basis of the running bill for a month. The rate contract for concreting is Rs. 1000/m of concrete. The consumption of number of cement of bags of weight 50 kg is 527. The mix proportion for the concrete is 1: 1.4 : 2.75 with W/C ratio of 0.52. The approximate billing amount of the month will be

A. Rs. 5, 27, 000
B. Rs. 1.49, 404
C. Rs. 62, 252
D. Rs. 26, 350
Answer» B. Rs. 1.49, 404