In a project, the common parameters are cost, schedule, and quality. In relationship to the others, quality should be ranked ______________.

A. first as the prime driver for a project
B. second behind cost but ahead of schedule
C. second behind schedule but ahead of cost
D. equal to cost and schedule
Answer» E.