If budgeted annual manufacturing indirect cost is $2250000 and cost allocation base is 2800 labour hour, then budgeted manufacturing overhead rate will be

A. 803.571 per labour hour
B. 805 per labour hour
C. 905 per labour hour
D. 802 per labour hour
Answer» B. 805 per labour hour