MCQOPTIONS
Saved Bookmarks
| 1. |
________ function of production planning and control determines the starting time and finishing time for each operation. |
| A. | routing. |
| B. | loading. |
| C. | scheduling. |
| D. | controlling. |
| Answer» C. scheduling. | |