Excavation of soil in a location for liner is known as ________ pit.
A.
Dig
B.
Borrow
C.
Barrow
D.
Excavated
Answer» C. Barrow
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The lateral leachate collection pipes shall slope towards ________ pipe.
What is the formula for quantification of leachate generation from landfill?
Drainage pipes of leachate collection system is filled with ________
PVC liners are suitable for landfills.
Bentonite is mixed when there is not enough clay available at a site to construct a soil liner.
Excavation of soil in a location for liner is known as ________ pit.
The horizontal joints that extends through the entire width of the dam section and are developed at each lift height is called as ___________________
Which of the following line acts as a dividing line between dry (or moist) and submerged line?
An arch dam looks like a single arch in _________________
When the height of the dam is in between 7.5 to 15, the Strange’s recommended value for maximum freeboard of low earth dams is ______________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply