Consider the following statements regarding bands to be provided for strengthening masonry work in masonry buildings constructed in zone III, IV and V?_x005F_x000D_(i) Lintel band is provided at lintel level on partition walls,_x005F_x000D_(ii) Gable band is provided at top of gable masonry below the purlins,_x005F_x000D_(iii) The bands shall be to full width of the wall and not less than 7.5 cm in depth,_x005F_x000D_(iv) The bands shall be made of reinforced concrete only._x005F_x000D_the correct statements are? |
A. | (i) and (ii) |
B. | (i) and (iii) |
C. | (ii) and (iv) |
D. | (ii) and (iii) |
Answer» E. | |