MCQOPTIONS
Bookmark
Saved Bookmarks
→
Civil Engineering
→
Hydraulics And Fluid Mechanics in Civil Engineering
→
Completion of an activity on CPM network diagram,..
1.
Completion of an activity on CPM network diagram, is generally known
A.
Event
B.
Node
C.
Connector
D.
All the above
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be
Earliest finish of an activity is always
Critical path
CPM is
The most popular type of organization used for Civil Engineering Constructions, is
The most suitable type of equipment for compaction of cohesive soils is
Slack time refers to
An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is
Critical path lies along the activities having total float
Military organization is known as
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply