MCQOPTIONS
Saved Bookmarks
| 1. |
ARL is termed as ____________ |
| A. | Average Run Length |
| B. | Allocating Run Length |
| C. | Affected Run Length |
| D. | Assumed Run Length |
| Answer» B. Allocating Run Length | |