

MCQOPTIONS
Saved Bookmarks
1. |
ARL is termed as ____________ |
A. | Average Run Length |
B. | Allocating Run Length |
C. | Affected Run Length |
D. | Assumed Run Length |
Answer» B. Allocating Run Length | |