1.
All the necessary calculations will be done before setting the curve.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
All the necessary calculations will be done before setting the curve.
Find the chainage of second tangent point, if the chainage at the point of compound curve is given as 2345.87m and the curve length can be given as 568.54m.
Determine the short curve tangent distance by using the short curve and long curve tangent lengths given as 54.98m and 89.32m. The deflection angles at P.I and at long curve are given as 86 45 and 43 31 .
Find the value of the chainage of T1 by using the chainage of P.I and the tangent distance is given as 1024.31m and 707.57m.
Determine the value of long curve length of a compound curve, if the radius of curvature is given as 56.87m and the deflection angle is given as 65 43 .
Find the value of radius of curvature, if the degree of the curve is given as 7 .
For setting a compound curve, the theodolite is first placed at______________
In a compound curve, the point at which both the long curve and short curve will meet is called_________
A compound curve can be set by which of the following methods?
The observations made for setting a compound curve must be equal to_________